Edit Inspection Details Screen
Authorized users with access to the Inspections & Closeout screen can use the Edit Inspection Details screen to record an inspection date and indicate highway failures found for sub-surface utilities during each inspection subsequent to permit closeout.
Comments describing why an inspection was rejected and any necessary follow-ups are required for Utility permits when Highway Failure equals Yes.
This is available for sub-surface utility permit inspections from the Subsequent Inspection Details section of the Inspections and Closeout screen.
Navigation
Login > Portal > Search and select permit>Inspections & Closeout>Subsequent Inspection Details>Edit Inspection Details